VM server 2 prep

I have a new VM server coming in soon and preparing the basement for it.  Installing a wall mount rack system and giving the wall a little organization.  Had to prep the wall first as the Landlord installed “walls” to separate storage in the basement but they were quite flimsy.


Added 2 more 2×3’s spaced 2ft apart and screwed in from the back side as well as the top and bottom.


Added my 2×2 sheet of 3/4 ply and mounted the rack and an 8 port gigabit switch to the wall and tied up the minimal wiring for now.