Window replacement project – Weekend 1

After our trial run it was time to start on the rest of the house, we started with the most difficult windows, the 3 second story double windows.

WP_20150803_10_05_01_Pro WP_20150803_12_44_05_Pro WP_20150803_12_44_14_Pro WP_20150803_13_48_43_Pro

In 1 day we managed to get all 3 front second story windows finished, and the 2 second story windows on the left side of the house, leaving 6 windows on the back of the house to be done, and then planned on doing more 2 weeks from now

Leave a Reply

Your email address will not be published. Required fields are marked *